Designed for unloading or vertical lifting of heavy and large-sized items in construction weighing over 10,000 tons.

Lifting is carried out with the help of cargo jacks, which provide synchronous operation along the entire length of the structure.

Заказать товар
FEATURES

1. Scope of application of the system:

  • decoupling of roofs in sports facilities;
  • lifting of high-tonnage structures of buildings, bridges, reinforced concrete structures on permanent supports;
  • installation of large-span structures.

2. An construction and installation system is compiled individually for the Customer, depending on the weight of the construction item. The system includes: special heavy-duty cargo jacks, a common pumping station and precision control units for synchronous operation of the entire system;

3. The technology reduces the time for the construction of the facility as a whole; on average, the work takes up to 36 hours.

SPECIFICATIONS

Operational action group SD Emer

WEIGHT OF STRUCTURE

NOTE

2012

10,600 tons

Roof decoupling at the Kazan Arena stadium, Kazan

2013

22,000 tons

Roof decoupling at the Fisht stadium, Sochi

2014

8,500 tons

Roof decoupling at the Otkrytie Arena stadium, Moscow

2015

23,000 tons

Roof decoupling at the Zenith Arena stadium, Saint-Petersburg

2017

16,000 tons

Dismantling of the Lakhta Center high-tonnage facility, Saint-Petersburg